PROJECTS PORTFOLIO
Year: 2020 - 2021
Project:
Client:
Renesans Heavy Industries Turkmenistan
IDesign, Procurement, Construction and Commissioning of PE/PP pipeline extrusion facility in Turkmenabat.




Key facts:
-
Range of produced diameters 20-630mm
-
Total covered Area 3360m2
-
Capacity of production 1200kg/hour
Client: Water management entity Ashgabatagyzsuw
Year: 2016 - 2017
Project:
Construction of engineering networks of 10 Yyl Abadanchylyk Street from Ankara Street to B.Annanova Street.




Key facts:
Client: Polimeks Insat Turkmenistan
Year: 2016 - 2016
Project:
Design and construction of water pipeline system of the 3rd stage of the Olympic Town in Ashgabat 2016.




Key facts:
Client: Water management entity Ashgabatagyzsuw
Year: 2015 - 2015
Project:
Reconstruction of the olympic city's water lines with a total length of 7km, Ø530-630mm in Ashgabat:
-
On Ataturk Street from Kipchak Street to Oguzhan Street
-
Turkmenbashi street from 10 Yyl Abadanchylyk Street to Yashlyk Street)
-
3Hodja Ahmed Yasavy (from B.Ananov to Bitarap Turkmenistan shyoly)




Key facts:
-
7000m of pipes
-
Ø530-630mm Diameters used
Client:
Renesans Heavy Industries Turkmenistan
Year: 2020 - 2021
Project:
IConstruction of 432 MW (ISO condition) simple cycle gas turbine power plant
Installation and commissioning of gas pipeline between AGRS and turbines




Key facts:
-
TIG/MIG Welding Processes
-
Over 3000 WDI of welding works
-
Over 350 welding joint
-
Over 3000m of pipes installed
-
ASME 31.1, 31.1
-
98% NDT success rate
Client: Economic Society Taze Jay
Year: 2013 -2015
Project:
Construction of a water treatment plant for a supply of 50,000m3 of portable water per day. Installation of 100km pipeline in the village of Mukry Koytendag Etrap Lebap Welayat.




Key facts:
-
50,000m3 of portable water being supplied
-
Over 100km of pipelines installed
-
Over 300 people employed
Client: Water management entity Ashgabatagyzsuw
Year: 2013 - 2014
Project:
Removal of the reservoir and water supply network within the streets of A.Niyazov, Bitarap Turkmenistan and Gorogly in Ashgabat


Key facts:
Client: NATA holding and Water management entity Ashgabatagyzsuw
Year: 2012 -2012
Project:
ICRemoval of water and sewerage networks from the Beatarap Turkmenistan Shayaly construction zone in Ashgabat
(Water Supply Network of bitarap Turkmenistan - Oguzkhan streets)


Key facts:
Client: NATA holding and Water management entity Ashgabatagyzsuw
Year: 2012 - 2012
Project:
Relocation of the water and sewer systems out of the construction zone of the pedestrian crossing at the junction of A. Niyazov-Turkmenbashi


Key facts:
Client: Water management entity Ashgabatagyzsuw
Year: 2012-2012
Project:
Reconstruction of the water supply system on N.Pumma Street and Ch. Narimov Street in Ashgabat


Key facts:
Client: Water management entity Ashgabatagyzsuw
Year: 2011 - 2012
Project:
Reconstruction of the water pipeline from water treatment unit to Choganly in Ashgabat


Key facts:
Client: NATA holding and Water management entity Ashgabatagyzsuw
Year: 2011 - 2011
Project:
Removal of the water pipeline from the construction zone of the transport interchange in the area of the bridge crossing over the Karakum River north of the city of Gyami


Key facts:
Client: Administaration municipality of Annau city
Year: 2011 - 2011
Project:
-
Electification of wells on Horosan St. Serahs
-
Electification of wells on the street "Sh.Durda" Etrap Serahs
-
Electification of wells on Mollamurt Street etrapa Serahs
-
Electification of wells on Magtymguly Street etrapa Serahs.
-
Electification of wells on D/B "O.Salyr" etrap Serahs
-
Electification of wells on D/B "Bereket" etrapa Serahs
-
Electification of wells on D/B "A.Tekaeva" etrap Serahs
-
Electification of wells on Bugdayly Etrap Serahs


Key facts:
Client: Administaration municipality of Lebap welayat
Year: 2011- 2011
Project:
Intra-site water network of water treatment unit of Seydi city




Key facts:
-
12,000 of pipes installed
-
Over 50 people installed
Client: Administaration municipality of Lebap welayat
Year: 2010 - 2011
Project:
Reconstruction of the water pipeline of Seidi city from water treatment unit to Point A, Road 2


Key facts: